Upstream Waterton Reservoir Downstream
Date Waterton River near Waterton Park Drywood Creek near the Mouth FSL: 1185.7 m
Capacity: 114,418 dam3
Hollow Jet Valve Spillway Hydro Total Down Stream River Release Waterton River near Glenwood Waterton - Belly Diversion Canal
Level Storage % Full
Apr 11 n/a n/a 1,178.756 51,912 45.4 0.0 0.0 4.0 4.0 n/a n/a
Apr 12 n/a n/a 1,178.813 52,348 45.8 0.0 0.0 4.0 4.0 n/a n/a
Apr 13 n/a n/a 1,178.883 52,885 46.2 0.0 0.0 4.0 4.0 n/a n/a
Apr 14 n/a n/a 1,178.924 53,201 46.5 0.0 0.0 4.0 4.0 n/a n/a
Apr 15 n/a n/a 1,178.997 53,764 47.0 0.0 0.0 3.9 3.9 n/a n/a
Apr 16 n/a n/a 1,179.116 54,686 47.8 0.0 0.0 4.0 4.0 n/a n/a
Apr 17 n/a n/a 1,179.182 55,199 48.2 0.0 0.0 4.0 4.0 n/a n/a
Apr 18 n/a n/a 1,179.143 54,896 48.0 0.0 0.0 4.0 4.0 n/a n/a
Apr 19 n/a n/a 1,179.091 54,492 47.6 0.0 0.0 4.0 4.0 n/a n/a
Apr 20 n/a n/a 1,179.056 54,220 47.4 0.0 0.0 4.0 4.0 n/a n/a
Apr 21 n/a n/a 1,179.058 54,236 47.4 0.0 0.0 4.0 4.0 n/a n/a
Apr 22 n/a n/a 1,179.117 54,694 47.8 n/a n/a 4.0 n/a n/a n/a